Forward plan
September 2023 - December 2023 (01/09/2023 to 31/12/2023, Forward Plan)
No. | Item | ||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Oxford City Council Cabinet Members and Senior Officers
| |||||||||||||||||||||||||||||||||||||||||||||||||||||
Standing Item: Decisions on acquisitions and disposals within the Commercial Property Portfolio Investment Strategy | |||||||||||||||||||||||||||||||||||||||||||||||||||||
1. |
Property Investment Portfolio Analysis and Strategy Report Decision maker: Cabinet, Deputy Leader - Finance and Asset Management Decision due: Before 31 Mar 2030 Lead officer: Jane Winfield Notice of proposed decision first published: 27/09/2019 Anticipated restriction: Part exempt - view reasons |
||||||||||||||||||||||||||||||||||||||||||||||||||||
KEY DECISIONS DELEGATED TO OFFICERS | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Standing item: Decisions on property or development purchases over £500,000 for affordable housing | |||||||||||||||||||||||||||||||||||||||||||||||||||||
2. |
Use of s106 and Retained Right to Buy Receipts to increase the provision of more affordable housing Decision maker: Cabinet, Head of Planning and Regulatory Services, Chief Executive Decision due: Before 31 Dec 2030 Lead officer: Dave Scholes Notice of proposed decision first published: 30/10/2019 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Standing item: Land acquisition and Project Approvals for the development of homes in the HRA | |||||||||||||||||||||||||||||||||||||||||||||||||||||
3. |
Land acquisition and Project Approvals for the development of homes in the HRA Decision maker: Cabinet, Council, Executive Director (Communities and People), Chief Executive Decision due: Before 31 Dec 2030 Lead officer: Dave Scholes Notice of proposed decision first published: 07/05/2020 Anticipated restriction: Part exempt - view reasons Explanation of anticipated restriction: |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Standing Item: The Delivery Arrangements for Additional Affordable Housing | |||||||||||||||||||||||||||||||||||||||||||||||||||||
4. |
The Delivery Arrangements for Additional Affordable Housing Decision maker: Chief Executive, Executive Director (Communities and People) Decision due: Before 31 Dec 2030 Notice of proposed decision first published: 02/08/2021 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
5. |
Affordable Housing Delivery Programme Decision maker: Cabinet, Council, Executive Director (Communities and People), Executive Director (Development), Chief Executive Decision due: Before 31 Dec 2030 Lead officer: Dave Scholes Notice of proposed decision first published: 07/02/2022 Anticipated restriction: Part exempt - view reasons |
||||||||||||||||||||||||||||||||||||||||||||||||||||
6. |
Use of Retained Right to Buy Receipts to increase the provision of more affordable housing Decision maker: Cabinet, Executive Director (Communities and People), Chief Executive Decision due: Before 31 Dec 2030 Notice of proposed decision first published: 12/10/2021 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
7. |
Delivery of Affordable Housing (Railway Lane and Marston Paddock Sites) Decision maker: Cabinet, Executive Director (Development) Decision due: Before 31 Dec 2028 Lead officer: Dave Scholes Notice of proposed decision first published: 07/11/2022 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
8. |
Delivery of Affordable Housing (Oxford North, Goose Green and Meadow Lane) Decision maker: Cabinet, Executive Director (Development), Executive Director (Communities and People) Decision due: Before 31 Dec 2028 Lead officer: Dave Scholes Notice of proposed decision first published: 07/11/2022 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Standing item: Next Steps Accommodation Programme (NSAP) Property Purchases | |||||||||||||||||||||||||||||||||||||||||||||||||||||
9. |
Decision maker: Cabinet, Council, Chief Executive Decision due: Before 31 Dec 2030 Lead officer: Dave Scholes Notice of proposed decision first published: 08/10/2020 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Standing item: Acquisition of affordable housing at Barton Park | |||||||||||||||||||||||||||||||||||||||||||||||||||||
10. |
Barton - Acquisition of Affordable Property Decision maker: Executive Director (Communities and People) Decision due: Before 31 Dec 2030 Lead officer: Allison Dalton Notice of proposed decision first published: 25/11/2021 Anticipated restriction: Part exempt - view reasons |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Key decisions delegated to the Executive Director (Communities and People) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
11. |
Social Housing Decarbonisation Fund: Wave 2.1 Decision maker: Cabinet, Council, Executive Director (Communities and People) Decision due: Before 31 Dec 2028 Lead officer: Mish Tullar Notice of proposed decision first published: 16/09/2022 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
12. |
Disposal of Council Dwelling Houses Decision maker: Cabinet, Executive Director (Communities and People) Decision due: Before 31 Dec 2025 Lead officer: Bill Graves Notice of proposed decision first published: 01/06/2022 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
13. |
Decision maker: Cabinet, Council, Executive Director (Communities and People) Decision due: Before 31 Dec 2025 Lead officer: Richard Wood Notice of proposed decision first published: 20/03/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
14. |
Fire Door Replacement Programme Decision maker: Cabinet, Executive Director (Communities and People), Head of Housing Services Decision due: Before 31 Dec 2025 Lead officer: Malcolm Peek Notice of proposed decision first published: 28/04/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
15. |
Expansion of the Housing First Programme Decision maker: Cabinet, Executive Director (Communities and People) Decision: Before 31 Dec 2025 Lead officer: Ossi Mosley Decision status: Recommendations Approved Notice of proposed decision first published: 28/04/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
16. |
Fire Servicing and Maintenance Contract Decision maker: Cabinet, Executive Director (Communities and People) Decision: Before 31 Dec 2024 Lead officer: Bill Chamberlain Decision status: Recommendations Approved Notice of proposed decision first published: 04/06/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Key decisions delegated to the Executive Director (Development) | |||||||||||||||||||||||||||||||||||||||||||||||||||||
17. |
Implementation of the Housing Infrastructure Funding for Oxford North (Northern Gateway) Decision maker: Executive Director (Development) Decision due: Before 31 Dec 2025 Lead officer: Jenny Barker Notice of proposed decision first published: 03/08/2020 Anticipated restriction: Part exempt - view reasons |
||||||||||||||||||||||||||||||||||||||||||||||||||||
18. |
Housing Infrastructure Funding for Osney Mead – revised implementation arrangements Decision maker: Cabinet, Executive Director (Development) Decision due: Before 31 Dec 2025 Lead officer: Elaine Swapp Notice of proposed decision first published: 16/09/2022 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
19. |
Local Growth Funded Workspace Projects Decision maker: Executive Director (Development) Decision due: Before 31 Dec 2025 Lead officer: Andrew Humpherson Notice of proposed decision first published: 26/05/2020 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
20. |
Development of land at South Oxford Science Village (Land South of Grenoble Road) Decision maker: Executive Director (Development) Decision due: Before 31 Dec 2025 Lead officer: Jenny Barker Notice of proposed decision first published: 25/06/2021 Anticipated restriction: Part exempt - view reasons |
||||||||||||||||||||||||||||||||||||||||||||||||||||
21. |
Oxford Flood Alleviation Scheme (Amended Land Disposal) Decision maker: Executive Director (Development) Decision: Before 31 Dec 2024 Lead officer: Richard Waple Decision status: Recommendations Approved Notice of proposed decision first published: 13/05/2022 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
22. |
Appointment of a contractor for the Oxpens River Bridge Decision maker: Cabinet, Executive Director (Development), Executive Director (Communities and People) Decision due: Before 31 Dec 2028 Lead officer: Steve Weitzel Notice of proposed decision first published: 01/08/2022 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
23. |
Blackbird Leys Development Project Detailed Design Decision maker: Executive Director (Development) Decision: Before 31 Dec 2028 Lead officer: Karoline Soisalo de Mendonca Decision status: Recommendations Approved Notice of proposed decision first published: 01/03/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
24. |
Cowley Branch Line Project - Funding for Full Business Case Decision maker: Council, Executive Director (Development) Decision due: Before 31 Dec 2028 Lead officer: Ted Maxwell Notice of proposed decision first published: 31/10/2022 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
25. |
Implementing the Covered Market "Masterplan" Decision maker: Cabinet, Executive Director (Development) Decision due: Before 31 Dec 2028 Lead officer: Ted Maxwell Notice of proposed decision first published: 22/12/2022 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
26. |
City Centre Land Regeneration Scheme Decision maker: Council, Cabinet, Executive Director (Development) Decision due: Before 31 Dec 2028 Lead officer: Carri Unwin Notice of proposed decision first published: 16/03/2023 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
27. |
City Centre Land Transaction - St Aldate's Chambers Decision maker: Cabinet, Executive Director (Development) Decision: 2 Nov 2023 Lead officer: Alex Miller Decision status: Recommendations Approved Notice of proposed decision first published: 01/03/2023 Anticipated restriction: Part exempt - view reasons |
||||||||||||||||||||||||||||||||||||||||||||||||||||
28. |
Northfield Hostel Site Additional Affordable Housing Decision maker: Cabinet, Council, Executive Director (Development) Decision due: Before 31 Dec 2028 Lead officer: Dave Scholes Notice of proposed decision first published: 03/07/2023 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Key decision delegated to the Head of Financial Services | |||||||||||||||||||||||||||||||||||||||||||||||||||||
29. |
Decision maker: Cabinet, Head of Financial Services Decision due: Before 31 Dec 2024 Lead officer: Bill Lewis Notice of proposed decision first published: 01/03/2022 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Key decision delegated to the Head of Corporate Strategy | |||||||||||||||||||||||||||||||||||||||||||||||||||||
30. |
Local Electric Vehicle Infrastructure Grant and Project Decision maker: Cabinet, Head of Corporate Strategy Decision due: Before 31 Dec 2025 Lead officer: Sarah Hassenpflug Notice of proposed decision first published: 09/05/2022 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Key Decision delegated to the Head of Community Services | |||||||||||||||||||||||||||||||||||||||||||||||||||||
31. |
Ice Rink Car Parking Provision Decision maker: Cabinet, Head of Community Services Decision due: Before 31 Dec 2026 Lead officer: Steve Weitzel Notice of proposed decision first published: 28/04/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Key Decision delegated to the Head of Corporate Property | |||||||||||||||||||||||||||||||||||||||||||||||||||||
32. |
Bus shelter infrastructure and advertising concession contract Decision maker: Cabinet, Head of Corporate Property Decision due: Before 31 Dec 2024 Lead officer: Elaine Swapp Notice of proposed decision first published: 01/06/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Key Decision delegated to the Head of Housing Services | |||||||||||||||||||||||||||||||||||||||||||||||||||||
33. |
Resettlement Commitments for New Refugee Families Decision maker: Cabinet, Head of Housing Services Decision due: Before 31 Dec 2025 Lead officer: Alan Chandler Notice of proposed decision first published: 28/04/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
REPORTS TO CABINET AND COUNCIL | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Cabinet - 13 September 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
34. |
Integrated Performance Report for Q1 2023/24 Decision maker: Cabinet Decision due: 13 Sep 2023 Lead officer: Anna Winship Notice of proposed decision first published: 28/04/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
35. |
Decision maker: Council, Cabinet, Executive Director (Development) Decision due: Before 31 Dec 2028 Lead officer: Carri Unwin Notice of proposed decision first published: 08/03/2023 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
36. |
Treasury Management Annual Report 2022/23 Decision maker: Cabinet Decision due: 13 Sep 2023 Lead officer: Bill Lewis Notice of proposed decision first published: 28/04/2023 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
37. |
Park and Ride combined parking-and-bus ticket charges Decision maker: Council, Cabinet Decision: 13 Sep 2023 Lead officer: Ted Maxwell Decision status: Recommendations Approved Notice of proposed decision first published: 03/07/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
38. |
Out of Hospital Care Team Provision Decision maker: Council, Cabinet, Executive Director (Communities and People) Decision due: Before 31 Dec 2025 Lead officer: Peter Moore Notice of proposed decision first published: 03/07/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
39. |
The Leys Pool and Leisure Centre - Youth Hub Decision maker: Cabinet, Council, Executive Director (Communities and People) Decision due: Before 31 Dec 2025 Lead officer: Hagan Lewisman Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
40. |
Local Authority Housing Fund - Round 2 Decision maker: Council, Cabinet, Executive Director (Communities and People) Decision due: Before 31 Dec 2025 Lead officer: Stephen Cohen Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
41. |
HRA Energy Efficiency Projects 2023/24 Decision maker: Cabinet, Executive Director (Communities and People) Decision: Before 31 Dec 2025 Lead officer: Juliet Nicholas Decision status: Recommendations Approved Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
42. |
City-wide Smoke Control Area for Oxford Decision maker: Cabinet, Head of Corporate Strategy Decision: Before 31 Dec 2024 Lead officer: Mai Jarvis Decision status: Recommendations Approved Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
43. |
Private Rented Sector Regulation Policies Decision maker: Cabinet Decision: 13 Sep 2023 Lead officer: Gail Siddall Decision status: Recommendations Approved Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
44. |
Housing Infrastructure Funding Update Decision maker: Cabinet, Head of Regeneration and Economy Decision due: Before 31 Dec 2025 Lead officer: Jenny Barker Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
45. |
Blackbird Leys Development Project Land Appropriation Decision maker: Cabinet Decision: 13 Sep 2023 Lead officer: Karoline Soisalo de Mendonca, Elaine Swapp Decision status: Recommendations Approved Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
46. |
Blackbird Leys Development Project Variations to Development Agreement with Development Partner Decision maker: Council, Cabinet, Executive Director (Development) Decision due: Before 31 Dec 2028 Lead officer: Karoline Soisalo de Mendonca Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Council - 2 October 2023 Reports from Cabinet: · Park and Ride Combined Parking and Bus Ticket Charges · Delivery of New Burial Space · Local Authority Housing Fund Round 2 · Northfield Hostel Site Affordable Homes · Leys Pool and Leisure Centre – Youth Hub · Out of Hospital Care Team Provision · Blackbird Leys Development Project Development Agreement | |||||||||||||||||||||||||||||||||||||||||||||||||||||
47. |
Outside Organisation Report: Children's Trust Board Decision maker: Council Decision due: 2 Oct 2023 Lead officer: Mish Tullar Decision status: Information Only Notice of proposed decision first published: 31/03/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
48. |
Outside Organisation Report: Future Oxfordshire Partnership Decision maker: Council Decision due: 27 Nov 2023 Lead officer: Mish Tullar Decision status: Information Only Notice of proposed decision first published: 01/06/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
49. |
Oxfordshire County Council - Division Boundary Review Decision maker: Council Decision due: 27 Nov 2023 Lead officer: Martin John Decision status: Abandoned Notice of proposed decision first published: 24/04/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Cabinet - 18 October 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
50. |
Bertie Place Affordable Housing Scheme Decision maker: Cabinet, Head of Housing Services Decision due: Before 31 Dec 2024 Lead officer: Dave Scholes Notice of proposed decision first published: 03/07/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
51. |
Delivery of Electric Vehicle Infrastructure for Oxford Decision maker: Cabinet, Head of Corporate Strategy Decision due: Before 31 Dec 2025 Lead officer: Tina Mould Notice of proposed decision first published: 03/07/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
52. |
Approval of proposed commercial lettings Decision maker: Cabinet, Executive Director (Development) Decision due: Before 31 Dec 2025 Lead officer: Alex Miller Notice of proposed decision first published: 01/06/2023 Anticipated restriction: Part exempt - view reasons |
||||||||||||||||||||||||||||||||||||||||||||||||||||
53. |
CIL Partial Charging Schedule Review Decision maker: Cabinet Decision: 18 Oct 2023 Lead officer: Lan Nguyen Decision status: Recommendations Approved Notice of proposed decision first published: 03/07/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
54. |
Oxford Local Plan 2040 Regulation 19 Consultation Document Decision maker: Cabinet, Council Decision: 18 Oct 2023 Lead officer: Sarah Harrison Decision status: Recommendations Approved Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
55. |
Local Government Association Corporate Peer Challenge Decision maker: Cabinet Decision: 18 Oct 2023 Lead officer: Lucy Cherry Decision status: Recommendations Approved Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
56. |
Utilities Procurement 2024 - 2028 New! Decision maker: Cabinet, Head of Corporate Strategy Decision due: Before 31 Dec 2024 Lead officer: Rose Dickinson Notice of proposed decision first published: 01/09/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Cabinet - 15 November 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
57. |
Decision maker: Cabinet Decision due: 13 Dec 2023 Lead officer: Douglas Kerrigan Decision status: Abandoned Notice of proposed decision first published: 01/03/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
58. |
Equalities Update New! Decision maker: Cabinet Decision: 13 Dec 2023 Lead officer: Helen Bishop Decision status: Recommendations Approved Notice of proposed decision first published: 01/09/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
59. |
Integrated Performance Report for Q4 2022/23 Decision maker: Cabinet Decision due: 10 Jul 2024 Lead officer: Nigel Kennedy Decision status: Abandoned Notice of proposed decision first published: 01/03/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
60. |
Leisure Management Contract New! Decision maker: Cabinet, Executive Director (Communities and People) Decision: Before 30 Jun 2024 Lead officer: Hagan Lewisman Decision status: Recommendations Approved Notice of proposed decision first published: 01/09/2023 Anticipated restriction: Part exempt - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
61. |
Council Tax Reduction Scheme for 2024/25 Decision maker: Cabinet Decision: 24 Jan 2024 Lead officer: Laura Bessell Decision status: Recommendations Approved Notice of proposed decision first published: 28/04/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
62. |
Grant Allocations to Community & Voluntary Organisations 2024/25 Decision maker: Cabinet Decision: 15 Nov 2023 Lead officer: Ian Brooke Decision status: Recommendations Approved Notice of proposed decision first published: 28/04/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
63. |
Central (City & University) Conservation Area Appraisal New! Decision maker: Cabinet Decision: 15 Nov 2023 Lead officer: Clare Golden Decision status: Recommendations Approved Notice of proposed decision first published: 01/09/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Council - 27 November 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
64. |
Outside organisation report: Oxford Safer Communities Partnership Decision maker: Council Decision due: 27 Nov 2023 Lead officer: Richard Adams Decision status: Information Only Notice of proposed decision first published: 01/08/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
65. |
Council and Committee meetings programme for May 2024 to May 2026 New! Decision maker: Council Decision due: 27 Nov 2023 Lead officer: Jonathan Malton Notice of proposed decision first published: 01/09/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Cabinet - 13 December 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||
66. |
Authority Monitoring Report and Infrastructure Funding Statement 2022/23 New! Decision maker: Cabinet Decision: 13 Dec 2023 Lead officer: Alexander Sutton Decision status: Recommendations Approved Notice of proposed decision first published: 01/09/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
67. |
Integrated Performance Report for Q2 2023/24 New! Decision maker: Cabinet Decision: 13 Dec 2023 Lead officer: Anna Winship Decision status: Recommendations Approved Notice of proposed decision first published: 01/09/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
68. |
Medium Term Financial Strategy 2025/26 - 2027/28 and 2024/25 Budget for consultation New! Decision maker: Cabinet Decision: 13 Dec 2023 Lead officer: Nigel Kennedy Decision status: Recommendations Approved Notice of proposed decision first published: 01/09/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
69. |
Private Rented Sector Regulation Policies - results of consultation New! Decision maker: Cabinet Decision: 24 Jan 2024 Lead officer: Gail Siddall Decision status: Recommendations Approved Notice of proposed decision first published: 01/09/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
70. |
Oxfordshire Food Strategy Action Plan New! Decision maker: Cabinet Decision: 13 Mar 2024 Lead officer: Hagan Lewisman Decision status: Recommendations Approved Notice of proposed decision first published: 01/09/2023 Anticipated restriction: Open - |
||||||||||||||||||||||||||||||||||||||||||||||||||||
71. |
Joint Venture LLP for South Oxford Science Village Decision maker: Cabinet Decision due: 11 Dec 2024 Originally due: 13 Sep 2023 Lead officer: Jenny Barker Notice of proposed decision first published: 01/07/2022 Anticipated restriction: Part exempt - view reasons |