Issue - decisions
Local Electric Vehicle Infrastructure (LEVI) electric vehicle (EV) chargepoint installations
05/11/2025 - Award of Contract for: Local Electric Vehicle Infrastructure (LEVI) electric vehicle (EV) Chargepoint installations
The Deputy Leader, and Cabinet Member for a Zero Carbon Oxford decides as follows:
1. Award a concession contract for the delivery of Local Electric Vehicle Infrastructure (LEVI) chargepoint installations for a period of 15 years to the winning supplier.