Issue details
Old Gasworks Footbridge Repairs and Renovation
To design and seek approval for the repair of the Gasworks Pipe Bridge.
A first phase of a feasibility study (now completed) undertook a general condition survey of the existing structure. The survey identified areas of significant thinning by corrosion in some of the steel frame members and cracking in the reinforced concrete decking. These defects require further site investigation of a more intrusive and detailed nature and to undertake a desktop analysis of the residual structural strength in order to assess the risk. From that, the nature and extent of necessary repairs can be determined and likely cost.
Decision type: Non-key
Decision status: Recommendations Approved
Notice of proposed decision first published: 10/10/2019
Decision due: 12 Sep 2019 by Executive Director (Development)
Decision due: 3 Dec 2021 by Head of Corporate Property
Contact: Tom Bridgman, Executive Director (Development) Email: Tbridgman@oxford.gov.uk Email: tbridgman@oxford.gov.uk.
Decisions
- 10/10/2019 - Old Gasworks Footbridge Repairs and Renovation
- 23/12/2021 - Gasworks Pipe Bridge - Option to repair stage 2